Testing RCD’s with Rapid Test is up to 180 times faster than you might be having them tested currently!
In fact, one client reports RCD testing that would normally take a week, is now taking one hour!
Rapid Test is a RCD (Safety Switch) testing device that is installed in your switchboard, It replaces the need for a technician to test RCD’s using a RCD tester via your power point, or the need for an electrician to test RCD’s directly on a live switchboard.
The Rapid Test system provides safe and rapid RCD testing functionality at the local switchboard. It is designed to be used in conjunction with the Rapid Test switchboard app on a tablet. There is no need to test on a live switchboard, and there is no need to locate and test individual circuits from the field.
Why is that important?
At Rapid Test, we know there are 2 ways to test a RCD. The slow and safe way, and the quicker and unsafe way.
- A technician can take 8-15 minutes to test each RCD at a power point and then record the data.
- An electrician, whilst testing and recording data at your live switchboard, can take 2 minutes per RCD.
- With Rapid test, each RCD test including data collection takes 5 seconds – yes, you did read that right! 5 seconds!!!
Check out our detailed video here for an in depth explanation of the system.
WiFi Integration makes Reporting Seamless
We 100% guarantee Rapid Test will save you time, money and headaches, all whilst ensuring your RCD compliance. We promise to leave all the jargon at the door, so for more information, and find out how easy it is to have Rapid Test installed in your workplace.
The integration of Wi-Fi allows for the transfer of detailed information captured during testing being immediately available to the end user on a tablet device. This functionality alone ensures quality control and saves valuable time.
Captured information is sent to our cloud-based reporting system and provides easy access to view testing results and compliance certificates as required. Importantly, there is no manual transfer of any written information to a computer for editing, and no manual production of compliance reports! Yes, that’s right, no more trying to decipher your local electricians’ handwriting!
How Rapid Test works
A two-part “master and slave” product, Rapid Test can be retrofitted into your switchboard by a licensed electrician quickly, easily and with minimal disruption to your business operations.
The “master” unit contains a RCD tester (a testing device) and is integrated with state of the art Wi-Fi capabilities. The “slave” channel board houses 24 channels and can be connected to 24 RCD’s via a coupling wire. We know you are likely to have more than 24 RCD’s in your switchboard, so one “master” unit can be connected to up to 10 “slave” channel boards if required.
Purchase Your Rapid Test Product
Register Your Product For Warranty
Have an electrican install the product
Download the rapid test app
Purchase a rapid test reporting portal plan
Safely and efficiently test your RCD (safety switches) as required
Download your compliance certificates and testing data as required
Rapid Test Key Benefits
Testing RCD’s with Rapid Test is up to 180 times faster than you might be having them tested currently!
Electrician / Technician not required
Once Rapid Test is installed in your switchboard by a licensed electrician, anyone in your organisation can safely test your RCD's using the Rapid Test System saving considerable contractor costs.
Safely test RCD's
By using the Rapid Test System, an electrician is not required to work on a live switchboard to test RCD's. Live works are inherently dangerous and are prohibited in some States in Australia.
Quickly test RCD's
A technician testing RCD's by simulating a fault at a power point is a slow and cumbersome process that causes considerable downtime. Rapid Test will test your RCD's up to 180 times faster than a technician.
Automated test data collection
Documentation of your RCD testing regime is vital. Standard hand written reports are slow to prepare and can be illegible. The Rapid Test system collects all test data during the testing process and uploads to the cloud automatically.
Automated compliance reporting
We know you don't want to manage your compliance reports; so we do it for you in our secure reporting portal. All compliance reports are available online from any internet enabled computer 24/7.
Massive cost saving
Traditionally, labour costs made up the majority of your RCD testing annual spend. The Rapid Test system can be operated safely and quickly by your internal staff to reduce contractor labour costs.
Brendan Plowman
Construction Electrical Services Pty Ltd
Operations Manager
“We were looking for a safer and more efficient way to test RCD’s as it is very time consuming and difficult to manage. I wish we knew about this system earlier.”
How do I test my RCD's using Rapid Test?
Rapid Test’s 10 step process makes testing your RCD’s so simple – anyone with a tablet and the Rapid Test app can do it!
Total time to test all RCD’s on your Rapid Test connected switchboard will depend on how many RCD’s are connected on each switchboard.
Each RCD takes approximately 5 seconds to test, perform data capture and upload.
Download the Rapid Test app from your relevant App Store
Power up the Rapid Test system on the switchboard with the RCD’s you wish to test
Open the Rapid test application on your tablet so it connects to the Rapid Test master module via WIFI
Login to the Rapid Test application using your own secure credentials
Select the relevant Business / Site / Switchboard you wish to test in the application
Using the tablet application, test all connected RCD’s with one quick easy selection button
The Rapid Test unit conducts the tests and will confirm the pass or fail status of each RCD test
Using the Rapid Test app, upload all captured test data to the Rapid Test data portal for complete records of test history.
Power down the Rapid Test Master on the switchboard
Move to the next Rapid Test connected switchboard with RCD’s and repeat steps 2-9
DATA SUBSCRIPTION PLANS & PRICING
Recording and communicating your regular RCD testing as part of your overall WHS compliance management quickly and easily is essential. Rapid Test offer subscription and reporting levels tiered to suit business operations large and small
-
Bronze
FREE SUBSCRIPTION TRIAL
-
Silver
AUD $ 100 /yr -
Gold
AUD $ 500 /yr -
Platinum
AUD $ 1000 /yr
DATA SUBSCRIPTION PLANS & PRICINGRecording and communicating your regular RCD testing as part of your overall WHS compliance management quickly and easily is essential. Rapid Test offer subscription and reporting levels tiered to suit business operations large and small |
Bronze |
Silver |
Gold |
Platinum |
---|---|---|---|---|
Yearly price | FREE SUBSCRIPTION TRIAL |
AUD
$
100
/yr
|
AUD
$
500
/yr
|
AUD
$
1000
/yr
|
Single user access to view RCD Testing Data for one switchboard. | 5 user access to view, generate and export RCD testing reports for up to 10 switchboards. | 25 user access to view, generate and export RCD testing reports for up to 50 switchboards. | Unlimited access to the Rapid Test RCD testing portal to view, generate and export testing reports for an unlimited number of switchboards across an unlimited number of sites and businesses. |
Contact the rapid test customer team today!
Call Us
Email Us
Free Quote
Speak to
Your Local Nhp Rep. Or Electrical Wholesaler